Digital library of construction informatics and information technology in civil engineering and construction
ITC
Digital library
Home
All papers
Browse by series
Browse by authors
Browse by keywords
Browse by years
Papers with keyword process model:
Year
Paper
Year
Paper
2013
Valdés, Francisco; Andres Cavieres; Russell Gentry (2013).
A Process-Centric Approach for Teaching Digital Fabrication
.
SIGraDi 2013 [Proceedings of the 17th Conference of the Iberoamerican Society of Digital Graphics - ISBN: 978-956-7051-86-1] Chile - Valparaíso 20 - 22 November 2013, pp. 400 - 404
2001
Karhu, Vesa (2001).
A generic construction process modelling method
.
Royal Institute of Technology, Department of Construction Management and Economics, Ph.D. Thesis, Stockholm, Sweden, 2001
2007
Annie Guerriero, Sylvain Kubicki, Gilles Halin (2007).
A model-based approach to develop a dashboard tool integrating trust concepts in AEC
.
281
2007
Felix Hofmann, Volker Berkhahn (2007).
Adjusting a tool for collaborative planning to requirements in practice - realisation of a client-server architecture
.
325
2007
Wael Sharmak, Raimar J. Scherer, Peter Katranuschkov (2007).
Configurable knowledge-based risk management process model within the general construction project process model
.
301
2013
Flood I,Nowrouzian V (2013).
Construction process modelling: a constrained graphics approach versus conventional construction simulation
.
CONVR 2013
2010
Ivan Panushev, Charles Eastman, Rafael Sacks, Manu Venugopal, Vahideh Aram (2010).
Development Of The National BIM Standard (NBIMS) For Precast/Prestressed Concrete
.
CIB W78 2010 - Applications of IT in the AEC Industry
2021
Z Meng, N Kremer, B Klusmann, A Meins-Becker, J Beetz (2021).
Development of Information Delivery Controlling Tool based on Process Modeling
.
Proceedings of the 38th International Conference of CIB W78, Luxembourg, 13-15 October, pp 32-40
2010
Manu Venugopal, Charles Eastman, Rafael Sacks, Ivan Panushev, Vahideh Aram (2010).
Engineering Semantics of Model Views for Building Information Model Exchanges Using IFC
.
CIB W78 2010 - Applications of IT in the AEC Industry
2011
G Lee, Sl Ham, Y Hyun Park (2011).
FRAMEWORK OF THE EXTENDED PROCESS TO PRODUCT MODELING (XPPM) FOR EFFICIENT IDM DEVELOPMENT
.
Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
2008
Mauricio Toledo & Martin Fischer (2008).
GPOP: REPRESENTATION OF SUSTAINABILITY CONSIDERATIONS ON BUILDING PROJECTS
.
CIB W78 2008 - Improving the management of construction projects through IT adoption
2008
Raimar J.Scherer, Wael Sharmak (2008).
Generic Process Template Description for the Effect of Risks on Project Schedule
.
CIB W78 2008 - Improving the management of construction projects through IT adoption
2007
K. U. Gökce, R. J. Scherer, H. A. Dikba? (2007).
IFC based computer-integrated construction project management model
.
119
2004
Anders Ekholm (2004).
ISO 12006-2 and IFC – could they be harmonized?
.
1998
Svensson, Kjell (1998).
Integrating Facilities Management Information, A Process and Product Model Approach
.
Royal institute of Technology, Department of Construction Management and Economics,Ph.D. thesis, Stockholm, Sweden
2011
M Kadolsky,Y Srewil, R J Scherer (2011).
Knowledge-Based on site process optimization using RFID technology
.
Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
2001
Berg Von Linde, Richard (2001).
Making Process Models Usable
.
Royal institute of Technology, Department of Construction Management and Economics,Licentiate thesis, Stockholm, Sweden
2007
A. Gehre, P. Katranuschkov, R. J. Scherer (2007).
Managing virtual organization processes by semantic web ontologies
.
177
1998
Laitinen, Jarmo (1998).
Model Based Construction Process Management
.
Royal institute of Technology, Department of Construction Management and Economics,Ph.D. thesis, Stockholm, Sweden
2007
Gerald Faschingbauer, Raimar J. Scherer (2007).
Model and sensor data management for geotechnical engineering application
.
711
2007
Can Ersen F?rat, Juhani Kiiras, Kalle Kähkönen, Pekka Huovinen (2007).
Model based scheduling in building projects – is it oxymoron?
.
337
1993
de VRIES B (1993).
Normalised message exchange in building industry
.
Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993
2007
H. Hofmeyer, M. C. M. Bakker (2007).
Positioning FEM in the transformation of spatial design to structural design
.
515
2010
Alina Delgado, Frank DeTroyer (2010).
Process Model for Understanding Stakeholders Expectations in New Projects Development
.
CIB W78 2010 - Applications of IT in the AEC Industry
2021
L Messi, F Spegni, A Carbonari, L Ridolfi, M Vaccarini (2021).
Process-based simulation models using BPMN for construction management at runtime
.
Proceedings of the 38th International Conference of CIB W78, Luxembourg, 13-15 October, pp 519-528
2002
O'Brien W J, Issa R R A., Hammer J, Schmalz M S, Geunes J, Bai S X (2002).
SEEK: Accomplishing enterprise information integration across heterogeneous sources
.
Electronic Journal of Information technology in Construction, Vol. 7, pg. 101-124.
1999
Bjork, Bo-Christer; Nilsson, Anders; Lundgren, Berndt (1999).
The construction and facilities management process from an end users perspective - PROFACIL
.
Hannus M. and Kazi, A. (edts); Proceedings of the 2nd International Conference on Concurrent Engineering in Construction - CEC99, 25-27 August 1999, Espoo, CIB TG33 and VTT, Finland
hosted by University of Ljubljana
includes:
W78
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]